DAY ONE 1 1/2” ASPHALT GRIND
CASP INSPECTION and correction for ADA PARKING STALL
DAY TWO INSTALL
DAY TWO ROLLING OUT
Need a solution that lasts more then 6 months for the big crack problems
Asphalt Crack repair
using an Asphalt Infrared Heater
Infrared Asphalt heater can heat up to 1000 degrees, heating the asphalt up to 450 degrees two inches down. Scrape the asphalt, add asphalt binder, even out with the lute compact with vibratory compactor plate. Ideal for large crack repairs. Heat and add asphalt to heavy vehicle wear marks in the asphalt. Patch alligator cracks.
INFRARED ASPHALT HEATER REPAIR
Heat up the area, rake the cracked area, add asphalt binder, add asphalt, compact.
DAY TWO 1 1/2” ASPHALT OVERLAY
DAY THREE PAINT STRIPE
DAY ONE DEMO AND GRADE
DAY ONE BASE INSTALL AND COMPACT
DAY THREE PAINT STRIPE
Infrared Asphalt Heater job site set up and prep
Infrared Asphalt Heat Repair to fix large cracks and alligator cracks. Why do an overlay that doesn't last? Heat, rejuvenator, a couple shovels of hot mix, & vibratory plate. DONE
200 Linear feet of Asphalt crack
200 Linear Feet of repaired Asphalt Cracks
READY FOR SEALCOAT!
if full demo and Overlay is not in the budget, then asphalt infrared heater repair might be the answer.
TWO hour old asphalt patch. Compacted with a vibratory plate. Trash truck parks on top of patch.
“it’s better to have 6 inches of base and 4 inches of asphalt then to have 6 inches of asphalt and 4 inches of base.” The most important thing is to start with a good base, compact every two inches. Once asphalt has started to alligator there is a good chance that the base has been compromised, and the only thing to do is R&R the area.