CRACKFILL PAINT STRIPE
SEALCOAT
HOT MELT CRACKFILL
HOT MELT CRACK FILL AND ASPHALT INFRARED HAEATER REPAIR
SEALCOAT DAY
SEALCOAT COMPLETE
HANDICAP PAINT STRIPE
PAINT STRIPE
PAINT STRIPE
Ready to extend road to the v-ditch and sealcoat.
ONE COAT OF SEALER
Parking lot has alligator cracks and water has been pooling. Recommend demo asphalt and remove 4 inches of base. Install 4 inches of new base and compact. Install 4 inches of asphalt
Scope of work install 25 Ton overlay to address trip hazards and pooling. R&R sections that are loose, add and compact base.
ACCESS ROAD
STAMPED ASPHALT SEALCOAT AVAILABLE IN DIFFERENT COLORS.
Dirt removed, base added, asphalt installed, one coat of Sealmaster sealcoat
Patio overlay
Adding asphalt to the narrow road in Bell Canyon.
Diesel damage on the parking spots. Asphalt patch then ready for sealcoat.
full demo versus Overlay and pot hole repair
“it’s better to have 6 inches of base and 4 inches of asphalt then to have 6 inches of asphalt and 4 inches of base.” The most important thing is to start with a good base, compact every two inches. Once asphalt has started to alligator there is a good chance that the base has been compromised, and the only thing to do is R&R the area.
Low spot water pooling